LU
h
s
Order lines / day
4,200
Picks / day
5,040
Units / day
10,080
Load units / day
400
Warehouse floor allocation
Reallocate the modeled building area without moving any frame or warehouse object. Effective pick and path capacity changes immediately.
Site A – Central Warehouse
m²
52.2 % of network · capacity factor 1.00×
Site B – Regional Hub
m²
32.6 % of network · capacity factor 1.00×
Site C – City Depot
m²
15.2 % of network · capacity factor 1.00×
Cycle time check
– per order · target 120 s · peak utilization 0 %
Picking / order
–
Internal transport / order
–
Truck transport / order
–
No area has a pick performance yet — set it in the planner inspector.
Pick performance per area
| Area | Reference unit | Rate | Assigned / day | Capacity / day | Hours | Utilization | s / unit |
|---|---|---|---|---|---|---|---|
| No pick performance parameterized yet. | |||||||
Path throughput
| Connection | Type | Rate | Demand / day | Hours | Utilization |
|---|---|---|---|---|---|
| No connection throughput parameterized yet. | |||||
Loading layout …